Lebanon, TN Home Page City Government City Services Index Business & Development in Lebanon Employment Opportunities All About Lebanon
If you are looking for some type of technical information about the City Of Lebanon, you've come to the right place. If you cannot find the information you are looking for, please call the Engineering Department at 444-6300 xt 253 and ask to speak with either Lynne Jordan or Lynn Pruett

The Standard Water Specifications and the Standard Sewer Specifications for Subdivisions and General System Additions have been developed for all construction projects involving public facilities in the City Of Lebanon. The State of Tennessee Department of Enviornment and Conservation has approved these specifications until April 2005.

Hard copies are available either by downloading the file from this site or at the Office of the City/ Utilities Engineer, Jody Vance for $20.00. Hard copies include a CD with digital copies of standard details required on all projects. Please contact the Engineering Office in advance for a copy

City Of Lebanon Sewer Specifications (Acrobat Required) **Warning: VERY LARGE FILE**

City Of Lebanon Water Specifications (Acrobat Required) **Warning: VERY LARGE FILE**

Code of Ordinances For City Of Lebanon

Lebanon Street Index (may take a few minutes to download)

Hartmann Drive Current Status and Proposed Maintenance Schedule (may take a few minutes)

Sanitary Sewer Overflow Evaluation Report (SSOER)
As a part of an Agreed Order with the Tennessee Department of Environmental Conservation, the City of Lebanon has compiled a Sanitary Sewer Overflow Evaluation Report (SSOER) regarding all confirmed sanitary sewer overflows within the collection system in the calendar year of 2003. The SSOER database list information such as the date, location, reason for the overflow, measures taken to relieve the problem, and other details. The SSOER database can be viewed at the following links: 2003 SEWER OVERFLOW LOCATION MAP, 2003 SEWER OVERFLOW INFORMATION SPREADSHEET, at the Office of the City/Utilities Engineer, which is located at 200 Castle Heights Avenue North, during normal business hours. Any comments on the SSOER database or specific overflow locations or events are requested. Comments will be received for 60 days following this notice. Following this period all comments and the final form of the SSOER will be submitted to the Tennessee Department of Environmental Conservation for their review.

2003 SEWER OVERFLOW LOCATION MAP (Adobe PDF Format)

2003 SEWER OVERFLOW INFORMATION SPREADSHEET (Adobe PDF Format)

Gas, Water, & Sewer Taps Pricing

GAS TAPS

$125.00 INSIDE CITY
$200.00 OUTSIDE CITY
$125.00 FOR DUPLEX---MUST PAY FOR EXTRA METER

FIRST 250'-0" FROM CENTER OF ROAD. (NO CHARGE)
BEYOND 250'-0"---- $1.00 PER FOOT (INSIDE CITY)
BEYOND 250'-0"---- $2.00 PER FOOT (OUTSIDE CITY)

DUPLEX--- ONE LINE WILL "Y" TO EACH SIDE

INDUSTRIAL TAPS MUST CONTACT WAYNE JOHNSON @ 615-444-3647


WATER TAPS

3/4" $500.00 SINGLE DWELLING1" $550.00---OUTSIDE CITY
3/4" $500.00 PER SIDE FOR DUPLEX2" --- CONTACT WAYNE JOHNSON

1" $825.00 SINGLE DWELLING/ Outside City Limits: $915.00
2" $2800.00 SINGLE DWELLING/ Outside City Limits: $3160.00

3/4" IRRIGATION TAP--- $512.50 (NO SEWER TO BE CHARGED) Outside City Limits: $562.50

1" IRRGATION TAP----$837.50 Outside City Limits: $927.50

2" TAP AND HIGHER--- CONTACT WAYNE JOHNSON @ 615-444-3647


SEWER TAPS

Single Family Dwelling Duplexes
Inside City $1500.00 Inside City $2000.00
Outside City $2000.00 Outside City $2500.00

Apartments/ Multi Unit Residence Inside Limits: $750.00 Per unit/ Outside City Limits $850.00 per unit


***APARTMENTS OR COMPLEXES, INDUSTRIAL MUST CONTACT WAYNE JOHNSON @ 615-444-3647***

The City Of Lebanon & Wilson County

NPDES StormWater Quality Program

On March 10, 2003 the City Of Lebanon and Wilson County were required by the State of Tennessee to obtain a National Pollution Discharge Elimination System (NPDES) permit for its discharge of storm water run-off through the City's municipal Seperate Storm Sewer System. over the next few years several new programs will come to light relating to stormwater quality as the City takes a larger role in protecting one of our most valuable natural resources.

For more information contact:

Jody Vance City Of Lebanon 615-443-2824

Tom Brashear Wilson County 615-449-2836

 

Related materials:

After the Storm

Construction ESC

Detailed Septic Info

Septic Checklist

Shorter Septic Info

Runoff Placement

Solution to Pollution

Stormwater Pollution Solutions

 

Ordinance 04-2672
Exhibit A


Title 14 - PLANNING AND ZONING
Chapter 15 - PLANNING AND ZONING FEES

14-1501. Subdivision plat application fee.
All applications for consideration by the Planning Commission of a preliminary or final subdivision plat shall include an application fee. The application fee shall be calculated as follows: $25.00 base fee plus $25.00 per lot after the first lot. A separate fee shall be collected for each preliminary and/or final subdivision plat submittal.

Example -
14 lot final subdivision plat

$25.00 + ($25.00 x 13) = $350.00

14-1502. Site plan application fee.
(1) Residential
All applications for consideration by the Planning Commission of a preliminary or final site plan shall include an application fee. The application fee shall be calculated as follows: $75.00 base fee plus $10.00 per unit. A separate fee shall be collected for each preliminary and/or final site plan submittal.

(2) Non-residential
All applications for consideration by the Planning Commission of a site plan shall include an application fee. The application fee shall be calculated as follows: $75.00 base fee for buildings up to 5,000 square feet in size, plus $0.03 per square foot for buildings 5,001 to 20,000 square feet in size, plus $0.02 per square foot for buildings 20,001 to 100,000 square feet in size, plus $0.01 per square foot for buildings greater than 100,000 square feet in size.

Example -
32,000 square foot building

$75.00 + ($0.03 x 15,000) + ($0.02 x 12,000) = $765.00

14-1503. Zoning, Rezoning and Planned Unit Development application fee.
(1 ) Zoning or Rezoning
All applications for consideration by the Planning Commission for rezoning shall include an application fee. The application fee shall be calculated as follows: $400.00 base fee for properties up to five acres in size, plus $5.00 per acre for properties 6 to 100 acres in size, plus $2.50 per acre for properties greater than 100 acres in size. If more than one property is included as a single application, the fee shall be based on the total acreage of the request.

Example -
10 acre parcel

$400.00 + ($5.00 x 5) = $425.00

(1 ) Planned Unit Development
All applications for consideration by the Planning Commission for a Planned Unit Development shall include an application fee. The application fee shall be calculated as follows: $400.00 base fee for properties up to five acres in size, plus $20.00 per acre for properties 6 to 100 acres in size, plus $10.00 per acre for properties 101 to 500 acres in size, plus $5.00 per acre for properties over 500 acres in size. If more than one property is included as a single application, the fee shall be based on the total acreage of the request.

Example -
200 acre parcel

$400.00 + ($20.00 x 95)+ ($10.00 x 100) = $3,390.00